    Forward Deployed Engineer

    Solution Architect Cycle: Discovery to Handover

    Plan the five stages of the Order and Policy Assistant engagement, from discovery to handover, with a written gate for each stage and one owner per decision.

    By Published 7 min read

    • fde
    • solution-architect
    • pre-sales
    • discovery
    • proof-of-concept
    • handover
    Share

    What you'll learn: the five stages of a customer AI engagement, the written gate that ends each one, who owns each decision when a solution architect and a Forward Deployed Engineer (FDE) share the work, and what a handover pack holds, all shown on the Lumen Order and Policy Assistant.

    At a glance

    Figure 1. The five stages and their gates

    flowchart LR accTitle: The five stages of an AI engagement and their gates accDescr: Discover leads to Propose when the outcome sheet is signed. Propose leads to Prove when the proposal is accepted. Prove leads to Deliver when the proof of concept meets its criteria, or the engagement stops with a report. Deliver leads to Hand over when acceptance tests pass. A scope change sends the work back to Propose. D["1 Discover"] -->|"outcome sheet signed"| P["2 Propose"] P -->|"proposal accepted"| X["3 Prove, POC"] X -->|"criteria met"| L["4 Deliver"] X -->|"criteria missed"| E["Stop with a report"] L -->|"acceptance tests pass"| H["5 Hand over"] L -.->|"scope change"| P

    How to read this: each arrow is a written decision, and "stop with a report" is a normal, successful ending.

    • Every stage ends with one written gate that a named customer person signs or declines.
    • The architect owns the shape of the answer; the FDE owns whether it works in the customer's systems.
    • A proof of concept (POC) may miss its criteria, and a clean stop is worth what it cost.

    Scenario

    Composite scenario, not a real company. Lumen Industrial Supply, a fictional distributor of industrial equipment, wants an internal assistant for its 24 customer-operations agents that answers order and policy questions and cites the policy (illustrative: 9,600 contacts a month, 9-minute median). The sponsor is the Head of Customer Operations. The IT security lead, the platform team, the policy owner in Commercial and Finance all have a say. Nobody has written down who decides what.

    What you will be able to do

    • Write the gate for each of five stages as one signable sentence.
    • Assign each decision to the architect, the FDE, the sponsor or a control owner.
    • List what a handover pack contains.

    Prerequisites

    Core ideas

    Five stages, each with one question and one gate

    Stage Question Design-pack output Gate (a sentence the sponsor can sign)
    1 Discover What problem, for whom? Discovery notes, outcome sheet Head of Customer Operations signs the outcome sheet: median 9 minutes down to 6 or less, zero high-severity wrong policy answers
    2 Propose What will we build, at what cost? Minimum viable product (MVP) scope, estimate, proposal Sponsor accepts a read-only MVP at 68 person-days and a three-year total cost of ownership (TCO) of 93,357.50 (illustrative; estimation and TCO)
    3 Prove Does the riskiest part work on their documents? POC report Criteria met: go. Missed: stop, or one agreed change
    4 Deliver Does the MVP meet its acceptance criteria? Working service, tests AC-1 to AC-6 pass, including the superseded return policy and a credit hold
    5 Hand over Can Lumen run it without us? Handover pack Operations and the platform team accept the pack

    A gate that says "the team is happy" cannot be tested. Stages may overlap, but gates close in order.

    Who owns what

    Decision or deliverable Solution architect FDE Head of Customer Operations Security, platform, policy owner
    Outcome sheet Drafts Adds baseline timings Owns, signs Consulted
    Architecture and estimate Owns Tests feasibility, gives effort evidence Decides Security and platform review
    POC build and measurements Reviews Owns Provides six agents Policy owner supplies correct answers; security approves access
    Which policy text is current Raises the gap Indexes current versions only Informed Policy owner decides
    Security and platform approvals Prepares evidence Answers technical questions Sponsors Owns the decision
    Acceptance tests Writes criteria Implements, runs Signs Reviews
    Handover pack Reviews Owns Receives Receive runbooks

    On a small team one person wears two hats; the table says which when you decide.

    Figure 2. How a gate is closed

    sequenceDiagram accTitle: How a stage gate is closed accDescr: The FDE sends measurements to the architect. The architect drafts the gate note, checks data access with the IT security lead, then sends the note to the Head of Customer Operations. The head signs or declines, and the architect files the decision. participant F as FDE participant A as Architect participant S as IT security lead participant H as Head of Customer Operations F->>A: Measurements and test results A->>A: Draft gate note against agreed criteria A->>S: Data access check S-->>A: Confirmed or conditions A->>H: Gate note with evidence alt Criteria met H-->>A: Signed else Criteria missed H-->>A: Declined or one agreed change end A->>A: File the decision with the evidence

    How to read this: evidence travels from the FDE to the sponsor, and only the sponsor's reply changes the stage.

    At the customer: expect "who do we call when it breaks?" in the first meeting. The answer is the owner named in the handover pack.

    What goes in the handover pack

    • Context and container diagrams and the ADRs behind them (C4 model levels).
    • A runbook: deploy, roll back, rotate keys, what each alert means.
    • The test set, its scoring script and the latest results, so Lumen can tell whether the next prompt or model change made answers worse (evaluation).
    • The process for loading a new policy version and retiring the old one. This is where the superseded return policy would otherwise return.
    • Log design (answers recorded without customer personal data) and a cost report of real usage against the estimate.

    Worked example

    The Head of Customer Operations has seen a vendor demo and says: "Skip the POC and give all 24 agents the tool." Lengths are illustrative, except that Deliver and Hand over together are the 8 weeks (40 working days) behind the 68 person-days (estimate); MVP scope counts handover and pilot support in them. The POC is not in the 68, so price it separately.

    Stage Length Gate
    Discover 1 week Outcome sheet signed
    Propose 1 week Proposal with TCO table and exclusions
    Prove 3 weeks Six agents; the written POC criteria met (POC design)
    Deliver 7 weeks Acceptance tests AC-1 to AC-6 pass
    Hand over 1 week Pack signed

    Decision exercise. Choose one: (A) start the build for all 24 agents; (B) insist on a six-week POC; (C) propose a three-week POC with six agents and written pass and stop criteria.

    Model answer

    Option C. A demo shows the happy path; it does not show whether an agent is told the superseded 14-day return window, how a held order is handled, or what a month costs. A pays for the riskiest part last. B delays the sponsor for no reason they can accept.

    Practice task

    Add the cycle plan to your design pack. For each of the five stages write the question, the output, the gate as one signable sentence, its owner and a duration. Mark the stage you would shorten if the sponsor lost patience, and the risk that creates.

    Decide first, then reveal.

    Cycle: who decides, where it goes (interactive when JavaScript is on)

    Mid-Deliver, a team lead asks for discount approval inside the tool. Where does the work go?

    • Back to Propose
    • Straight into the build
    • Into Hand over
    Answer

    Back to Propose. A scope change sends the work back to Propose, where the trade-off is written down.

    The FDE finds two versions of the return policy in the library. Who decides which text is current?

    • The FDE, who builds the index
    • The policy owner
    • The architect
    Answer

    The policy owner. The policy owner decides; the FDE indexes current versions only.

    Commercial publishes a new policy version after launch. Which handover item tells Lumen's team what to do?

    • The runbook for deploy and rollback
    • The test set and scoring script
    • The process for loading a new policy version
    Answer

    The process for loading a new policy version. That is where the superseded return policy would otherwise return. The runbook covers running the service.

    Exercise

    Explain it back. In three sentences, explain to the Head of Customer Operations why the project needs five gates. A good answer names a risk per gate, gives one example gate sentence and says what happens when a gate is missed.

    Done when a colleague who has not seen your plan can say which stage you are in from the last signed gate.

    Hint 1: how to write a testable gate

    Start from the failure you want to avoid and write the evidence, with a number, that it did not happen.

    Hint 2: where plans go wrong

    Check Prove and Hand over for the stop outcome and the named owner.

    Common mistakes

    • Treating the demo as the POC.
    • Gates without owners: a signature from "the team" means nobody signed.
    • No exit option, so the sponsor funds "one more week" repeatedly.
    • Mixing roles silently: the architect promises a date the FDE has not seen.

    Knowledge check

    1. Why does each stage end with a written gate instead of a meeting?

    A meeting produces opinions; a gate produces a record that one named person accepted a specific claim. It lets you stop cleanly when evidence is missing.

    2. Who owns the decision that the POC met its criteria?

    The Head of Customer Operations decides, because the criteria were agreed with them. Neither the FDE nor the architect can sign for the customer without turning the gate into self-assessment.

    3. A sponsor asks to skip the POC because a demo went well. What is the strongest response?

    Offer a short, bounded POC with written pass and stop criteria. A demo shows the best case on chosen inputs, so it says nothing about superseded policies or cost. A short POC answers the worry, which is time.

    4. Name three handover items that are not source code, and why each matters.

    The runbook, the test set with its scoring script, and the process for loading a new policy version. Lumen's team must operate, test and update the service without the builders.

    5. When is a missed POC a success?

    When the criteria were agreed in advance and the report shows the idea misses them on Lumen's own data. Lumen avoids paying for a build that would not work.

    You can now

    • Add the cycle plan to your design pack.
    • Write a testable gate for each stage.
    • Say who owns each decision.
    • Argue for a bounded POC.

    Further reading

    Last verified: 2026-11-03

    Next

    The executive architecture briefing

    Ask about this article

    Get answers grounded in this post. AI-generated — based on this article, and may be imperfect.

    Scaled AI Weekly

    Enjoyed this? Get more like it every Monday.

    Real architecture decisions, LLMOps patterns that survive production, and engineering leadership advice — from 12+ years of building at enterprise scale. Free. No spam. Unsubscribe anytime.