    AI Architect Mindset: Requirements, ADRs, Design Reviews

    How AI architects write testable requirements, weigh build vs buy vs configure, record choices in decision records and run design reviews that end in decisions.

    By Published 27 min read

    Share

    This lesson is part of AI Architect: From AI Engineer to Expert. Enroll for free, then sign in, to read it in full.

    What you'll learn: how to turn a vague AI feature request into requirements you can test (quality bar, latency, cost, risk, data sensitivity), how to separate constraints from preferences, how to choose between building, buying and configuring, how to record the choice in an architecture decision record (ADR), and how to run a design review that ends in a decision and not in a shrug.

    The real-world problem

    A team is asked to "add an AI assistant to the support tool". Three weeks later there is a demo that answers well in the meeting. Then the questions start. Is it good enough to ship? Nobody agreed on what good means. How slow may it be? The product manager says "instant", the engineer says "a few seconds". What may it cost per ticket? Nobody asked. May it see customer account numbers? Legal was not in the room. The team has built something real without having decided anything, so every later argument is about taste.

    The mindset of an AI architect is to make those decisions first, in writing, in a form that a test can check. This page teaches the four tools for that: requirements that are testable, constraints that are named, a deliberate build vs buy vs configure choice, and ADRs and design reviews that make the reasoning survive. AI systems make this harder than usual, because the outputs are probabilistic: "does it work" turns into "how often does it work, on which inputs, measured how".

    After this page you will be able to

    • Rewrite a vague AI requirement into one that states a measurement, a threshold and the conditions under which it holds.
    • Compute whether a measured pass rate on an evaluation set supports a quality requirement, including its sampling uncertainty.
    • Choose between building, buying and configuring using explicit criteria, and say what would change your mind.
    • Write a complete ADR for a model-choice decision, with status and consequences.
    • Run a 60-minute design review with an agenda, a set of questions and a recorded outcome.

    You should know what a prompt, a context window and a token are. Background pages: LLM inference explained for how latency arises, Testing AI applications for evaluation basics, and Evaluating RAG with RAGAS for retrieval-specific measurement. For cost, use the site's LLM cost estimator instead of any price quoted in an article; prices change, and this page deliberately states none.

    This page does not teach how to draw diagrams (page 3), how to evaluate systems in depth (page 8) or how to model security threats (page 12). It gives you the habit of deciding first and writing it down.

    Terms used on this page: architecturally significant requirement, SLI, SLO, SLA, error budget, ADR, decision log, design review, risk tolerance and build vs buy vs configure.

    Core concepts

    Figure 1. From business goal to recorded decision

    flowchart TD accTitle: From business goal to recorded decision accDescr: A business goal produces quality requirements and constraints. They frame the options, the chosen option is written as an ADR and reviewed. An approved design is built and measured, and a miss produces a superseding ADR. G["Business goal"] --> Q["Quality requirements"] G --> C["Constraints"] Q --> O["Options: build, buy, configure"] C --> O O --> A["Decision record (ADR)"] A --> R{"Design review"} R -- approved --> B["Build and measure"] R -- "not approved" --> O B --> T{"Meets requirements?"} T -- yes --> OP["Operate and monitor"] T -- no --> S["Superseding ADR"] S --> O

    How to read this: requirements and constraints feed the options, the review gates the build, and a miss in measurement loops back as a new decision rather than a quiet patch.

    Requirements for AI systems

    An architecture involves many requirements, but only some shape the structure. The ADR community's site defines an architecturally significant requirement as "a requirement that has a measurable effect on the architecture and quality of a software and/or hardware system" (adr.github.io). That definition is the filter. "The button is blue" is a requirement; it does not change the architecture. "p95 latency under four seconds" does, because it decides whether you can call a large model synchronously, whether you need streaming and whether retrieval must be cached.

    For AI systems, the significant requirements fall into five groups. Functional requirements (what the system does) matter too, but the five below are where AI projects most often have nothing written down.

    The vocabulary: SLI, SLO, SLA

    Google's SRE book gives the vocabulary that makes a requirement testable. A service level indicator (SLI) is "a carefully defined quantitative measure of some aspect of the level of service that is provided". A service level objective (SLO) is "a target value or range of values for a service level that is measured by an SLI". A service level agreement (SLA) is a contract with consequences; the book's test is to ask "what happens if the SLOs aren't met?", and if there is no explicit consequence, you are almost certainly looking at an SLO (SRE book, Service Level Objectives).

    Three further points from that chapter carry straight over to AI features:

    • Start from the user: "Start by thinking about (or finding out!) what your users care about, not what you can measure."
    • Say how and where: "SLOs should specify how they're measured and the conditions under which they're valid." The book's own example is "99% (averaged over 1 minute) of Get RPC calls will complete in less than 100 ms (measured across all the backend servers)."
    • Use distributions: averaging latencies "obscures an important detail", the long tail, and a high percentile "shows you a plausible worst-case value".

    The book is about service levels such as latency, errors, throughput and availability. Applying the same SLI and SLO structure to answer quality is an extension, not something the chapter says, but it works because a quality score measured on a fixed sample is an SLI like any other.

    Figure 2. Anatomy of a testable requirement

    flowchart LR accTitle: Anatomy of a testable requirement accDescr: A user need becomes an indicator with a defined measurement point, then an objective with a target, window and conditions. The objective is checked by a test or monitor. A miss spends error budget and triggers a defined action. N["User need"] --> I["Indicator: what is measured, where"] I --> O["Objective: target, window, conditions"] O --> T["Check: eval set, load test, monitor"] T -- pass --> OK["Requirement met"] T -- fail --> E["Spend error budget"] E --> X["Defined action: fix, roll back, escalate"]

    How to read this: a requirement is complete only when it reaches a check and a defined action for failure, otherwise it is a wish.

    The five kinds, made testable

    Kind Vague version Testable version (illustrative values) How it is checked
    Quality bar "Answers must be accurate" At least 92% of answers on the 300-example release set are rated acceptable by two reviewers using rubric v3; re-measured on every prompt or model change Evaluation harness in CI, reviewer sample monthly
    Latency "It must feel instant" p95 end-to-end at most 4 s and p50 at most 1.5 s, for requests under 3,000 input tokens, measured at the API gateway over a rolling 7 days Load test before release, then production monitor
    Cost "Keep it affordable" Mean cost per request at most the budgeted amount, counted from the cost log including retries and embedding calls, plus a hard monthly cap Cost log per request, alert at 80% of the cap
    Risk "It must be safe" Zero accepted outputs that reveal another customer's data in the 80-case adversarial set; any hit blocks release; residual risk accepted by a named owner Red-team set in CI, incident review
    Data sensitivity "Handle personal data carefully" Prompts and outputs that contain restricted fields go only to providers on the approved list, never to general application logs, and are kept no longer than the stated retention period Config review, log scan, provider list audit

    Four habits make these hold up.

    Write the number and the measurement point together. "p95 under 4 s" is ambiguous until you say where the clock starts and stops. Measured at the browser, it includes the network and rendering; at the gateway, it does not. Both are legitimate, but a team that measures one while the user feels the other will argue forever.

    Quality needs a rubric, not a vibe. "Acceptable" must be defined in a written rubric that two reviewers can apply and mostly agree on. If reviewers disagree often, the requirement is not testable yet; fix the rubric first. A rubric with three or four levels and an example answer for each level is enough to start.

    Risk is probability times consequence, and tolerance is a decision. NIST's AI Risk Management Framework (AI RMF 1.0, NIST AI 100-1, January 2023) defines risk as "the composite measure of an event's probability of occurring and the magnitude or degree of the consequences of the corresponding event". It also says the framework "does not prescribe risk tolerance": tolerance is "highly contextual and application and use-case specific", and the framework lists "Organizational risk tolerances are determined and documented" as an outcome (MAP 1.5). The architect's job is to make sure someone with authority has named the tolerance, because the architecture (human approval steps, output filters, logging) depends on it. The same document notes that "attempting to eliminate negative risk entirely can be counterproductive", so a requirement should say what level is acceptable, not demand zero. The framework is intended to be voluntary, and its actions "do not constitute a checklist", so treat it as a vocabulary for the conversation, not as a compliance test. Its list of characteristics of trustworthy AI (valid and reliable, safe, secure and resilient, accountable and transparent, explainable and interpretable, privacy-enhanced, fair with harmful bias managed) is a useful prompt for what to ask of a given system. NIST also publishes a Generative AI Profile (NIST-AI-600-1, released 26 July 2024). As of 2026-10-21, NIST's page says AI RMF 1.0 is being revised, so check the NIST page for the current version.

    Data sensitivity is a requirement on the architecture, not a note in the policy. It decides which providers are allowed, whether a model can run in your own account, what the logs may contain and how long traces live. NIST's framework even gives an example of a system requirement in this area: "the system shall respect the privacy of its users" (MAP 1.6), which is the right form to start from and the wrong form to stop at. Turn it into the testable version in the table.

    Also follow the SRE book's cautions about targets: it advises against picking a target "based on current performance", against absolutes and against many SLOs (its advice is to "have as few SLOs as possible"), and it says it is "better to start with a loose target that you tighten". For AI features the first lesson matters most: a prototype that scores 88% on a hand-picked set is not a reason to write 88% into the requirement. Write what the business needs, and treat the gap to the prototype as the work.

    TIP

    Test each requirement with one question: "What result would make us say no?" If nobody can answer, the requirement cannot fail, so it cannot guide a design.

    Constraints

    A requirement says what the system must achieve. A constraint limits how you may achieve it. Constraints come from outside the design: a regulator, a contract, an existing platform, a budget, a deadline, the skills of the team. Keep them in a separate list, because they behave differently in decisions.

    Constraint Typical example What it rules out or forces
    Legal and contractual Customer data may not leave a named region Providers and regions; may force self-hosting
    Platform Must run on the company's existing cloud account and identity system Vendor products that need their own identity or network path
    Budget A fixed amount per month Larger models, long contexts, multi-step agents
    Time A launch date tied to a business event Build options with long lead times
    Skills Two engineers, none with search experience Self-built retrieval stacks
    Integration Must write to a ticket system that has no batch API Asynchronous designs that depend on bulk loads

    Two habits help. First, mark each constraint fixed or negotiable and name who can change it. "No data outside the region" is fixed by a contract; "finish by the end of the quarter" may be negotiable with a smaller scope. Second, write down constraints that are really preferences in disguise: "we prefer open-source" is a preference until a policy makes it a rule. Disguised preferences are the most common reason a design review stalls, because one side treats a preference as a law.

    Build vs buy vs configure

    There are three answers, not two. Build means writing the capability yourself on lower-level components (a model API, a vector database, your own orchestration). Buy means adopting a product or managed service whose behaviour the vendor controls. Configure means using a capability you already own, such as the search in your current document system or a feature of your current platform, and adjusting it without new software. Configure is the option teams forget, and it is usually the cheapest to test.

    Figure 3. Build, buy or configure

    flowchart TD accTitle: Build, buy or configure decision tree accDescr: Start by checking whether an owned capability meets the requirements, then whether a product meets them within constraints, and only then consider building. A failed trial at any step moves to the next option. S["Requirements and constraints written"] --> C1{"Does an owned capability meet them?"} C1 -- yes --> CF["Configure, then measure"] C1 -- no --> C2{"Does a product meet them within constraints?"} C2 -- yes --> BY["Buy, trial against the eval set"] C2 -- no --> C3{"Is the capability a differentiator or a hard constraint?"} C3 -- yes --> BU["Build, with a cost cap and review gates"] C3 -- no --> RE["Revisit scope or constraints"] CF -- "trial fails" --> C2 BY -- "trial fails" --> C3

    How to read this: the order is cheapest to test first, and a failed trial moves you down the tree with evidence instead of opinion.

    Criteria worth writing down for each option:

    • Fit to the requirements. Run the same evaluation set against each option. A vendor demo is not a test.
    • Total cost over the life of the system. Include licences, engineering time, running costs, evaluation and the people who maintain it, over three years rather than three months. A build that looks cheap in month three can be dominated by maintenance later; the contract search case shows the arithmetic.
    • Control and portability. How hard is it to leave? What happens if the vendor changes a model or price?
    • Time to first value. Configure is usually the quickest to start and build the slowest. If the requirement is time-bound, this can decide the matter.
    • Data handling. What leaves your boundary, and who is accountable for it?
    • Maintenance load. Who tests after a model update, and who answers the pager?

    The arguments pull both ways. Buying spreads maintenance across a vendor's customers; building thin layers around model APIs limits lock-in and keeps control of the data path. Which weighs more depends on your constraints. This page's default is to start with configure, then buy, and to build only what a requirement or constraint forces, but to write the ADR so the decision can be reversed when the evidence changes.

    Architecture Decision Records

    An architecture decision record captures one significant decision, so a person who joins in two years can see why the system looks the way it does. The adr.github.io site defines an architectural decision as "a justified design choice that addresses a functional or non-functional requirement" that is architecturally significant, and an ADR as something that "captures a single AD and its rationale". The collection of ADRs in a project is its decision log. The site credits Michael Nygard's 2011 post with popularising the idea.

    Nygard's post, "Documenting Architecture Decisions" (Cognitect, 15 November 2011), explains the problem: "One of the hardest things to track during the life of a project is the motivation behind certain decisions." A new person on the project has two choices, to blindly accept a decision or blindly change it, and changing it without understanding its motivation or consequences "could mean damaging the project's overall value". Nygard also observes that "Large documents are never kept up to date.", so he proposes small ones. An ADR is a short text file; each record describes a set of forces and a single decision made in response to them. It has five parts:

    Section What it holds Style note from the post
    Title A short noun phrase Numbered sequentially; numbers are never reused
    Context The forces at play: technological, political, social and project-local, often in tension Value-neutral language that states facts
    Decision The response to those forces Full sentences, active voice, starting "We will"
    Status proposed, accepted, deprecated or superseded A superseded record points to its replacement
    Consequences The resulting context after the decision is applied All of them: positive, negative and neutral

    The post says the whole record should fit on one or two pages, and suggests keeping the files in the project repository (at doc/arch/adr-NNN.md, in a lightweight markup such as Markdown) so they travel with the code.

    Figure 4. The life of an ADR

    stateDiagram-v2 accTitle: ADR status life cycle accDescr: A record starts as proposed and becomes accepted after review. An accepted record can later be deprecated or superseded by a newer record. Superseded records are kept. [*] --> Proposed Proposed --> Accepted: review approves Accepted --> Deprecated: no longer applies Accepted --> Superseded: newer ADR replaces it Deprecated --> [*] Superseded --> [*]

    How to read this: the status values are the four from Nygard's post, and nothing is deleted, a superseded record stays so readers know it was once the decision.

    The post's rule for reversals is the part teams skip: when a decision is reversed, the old ADR is kept and marked superseded ("It's still relevant to know that it was the decision, but is no longer the decision."). If your team also needs a value for a proposal that was dropped, add one and define it in your template; the post does not prescribe it.

    When to write one. Write an ADR when a decision is expensive to reverse, when it constrains later choices, or when someone is likely to ask "why did you do it this way?" For AI systems that includes: choice of model and provider, build vs buy vs configure, retrieval strategy, where humans approve, what is logged, and which data may reach which model. Do not write one for choices that a one-line pull request comment explains.

    When to supersede. Write a new ADR, do not edit the old one, when the context has changed in a way that would change the decision: a new model tier changes the quality-cost balance, a provider changes terms, a requirement is tightened. Editing the old record erases the history that makes the log useful. Set a review trigger in the Decision or Consequences ("revisit when the smaller tier reaches the bar on the release set") so supersession is planned.

    A worked ADR for a model choice

    This is an illustrative ADR for a ticket-summarisation feature. The model tiers are placeholders ("small tier", "large tier"), not real products, because model names and prices are volatile facts. The measurements are invented for the example; the interval method is shown in the Worked example.

    ADR 12: Use the large model tier for ticket summaries
    
    Status: Accepted (2026-10-21). Supersedes: none.
    
    Context
    Support agents need a three-sentence summary of long ticket threads. The
    requirements: at least 92% of summaries rated acceptable on the 300-example
    release set (rubric v3); p95 latency at most 4 s at the gateway; tickets may
    contain customer personal data, so only providers on the approved list may
    be used. About 150,000 summaries a month are expected. Two tiers from the
    approved provider were evaluated on the release set:
      small tier: 272 of 300 acceptable (90.7%), p95 1.8 s, relative cost 1
      large tier: 286 of 300 acceptable (95.3%), p95 3.1 s, relative cost 6
    With a normal-approximation 95% interval the pass rate of the small tier lies
    between about 87.4% and 94.0%, so the data do not prove it is below the bar, but its measured
    rate is under it. The large tier's lower bound is about 92.9%.
    
    Decision
    We will use the large tier for ticket summaries behind the model gateway,
    with the prompt and rubric versions recorded on every request.
    
    Consequences
    Positive: the quality requirement is met with margin and latency is within budget.
    Negative: the cost per summary is about six times the small tier's.
    Neutral: the model gateway lets us switch tiers per request type later.
    Review trigger: re-run the release set when the provider releases a new
    small tier, or when monthly cost exceeds the approved cap.

    Note what the ADR does. It names the requirement it is answering, shows the evidence, admits the uncertainty and states a trigger for revisiting. A reader can disagree with the decision, but cannot say they do not know why it was made.

    Design reviews

    A design review is a meeting with a defined purpose: decide whether a design is ready to build (or to launch), record the decision and the conditions. It is not a status update, not a demo and not a place to redesign from scratch. The ADR is the input; the decision log is the output.

    Who attends. Keep it small enough to decide: the author (owns the design and the ADR); an architect or senior engineer chairing; a product owner (who owns the requirements); a security or privacy reviewer when data sensitivity or tool access is in scope; an operations or reliability engineer; and the person who owns evaluation. A scribe records decisions. Anyone else reads the pre-read and sends comments.

    Agenda (60 minutes, illustrative). Five minutes for context and the decision requested. Ten minutes on requirements and constraints, checking each is testable. Twenty minutes walking the diagrams, from context to the runtime sequence to the failure paths. Fifteen minutes on risks and the draft ADRs. Ten minutes to decide, assign actions and set dates.

    Pre-read. One to two pages plus diagrams, sent two working days before: the requirements, the constraints, the options considered with the chosen one, the evaluation evidence, and the open questions. A review that spends its first twenty minutes reading is a review that will end undecided.

    Figure 5. A design review from request to decision log

    sequenceDiagram accTitle: Design review flow accDescr: The author sends a pre-read. Reviewers send comments before the meeting. In the meeting the architect checks requirements and failure paths, then records one of three outcomes in the decision log. Conditions create follow-up actions that return to the author. participant AU as Author participant RV as Reviewers participant AR as Architect participant DL as Decision log AU->>RV: Pre-read with requirements, options, ADR draft RV-->>AU: Written comments before the meeting AU->>AR: Walk through diagrams and failure paths AR->>AU: Questions on requirements, evidence, rollback AU-->>AR: Answers and evidence alt Design approved AR->>DL: Record approval and ADR status accepted else Approved with conditions AR->>DL: Record conditions, owners, dates DL-->>AU: Actions to close before launch else Not approved AR->>DL: Record missing evidence and reasons DL-->>AU: Revise and resubmit end Note over AU,DL: Every outcome is written down. Nothing ends as undecided.

    How to read this: the architect is the hinge between the author's evidence and the decision log, and every branch ends with a written entry.

    Questions an architect asks. These are the ones that expose most gaps:

    1. What requirement does this component exist to satisfy, and how will we know it does?
    2. What is the worst plausible output, and who is harmed if it reaches a user?
    3. What happens when the model provider is slow, down or returns something malformed?
    4. What is the cost per request at expected volume, and at ten times that volume?
    5. Which data goes to which component, and where does it get logged?
    6. What can the system do without a human approving it, and what is the maximum damage of one wrong action?
    7. How do we detect that quality has dropped after a model or prompt change?
    8. What is the rollback, and how long does it take?
    9. What is the simplest non-AI option, and why is it not enough?
    10. Which decision here is hardest to reverse, and is it written down?

    A good outcome is one of three recorded results: approved (ADRs set to accepted), approved with conditions (each condition has an owner and a date), or not approved (with the specific evidence missing). A review that ends with "looks fine, let's keep going" has not produced a decision. The meeting also fails if the author leaves unsure what to change.

    Case files

    • Claims triage copilot: requirements nobody wrote down. In a composite scenario, an insurer's pilot looked good in demos but could not be called a success or a failure. Pattern: requirements definition, written as testable statements with a labelled evaluation set.
    • Contract search: build, buy or configure. In a composite scenario, a legal team began building and then discovered the three-year cost. Pattern: build vs buy vs configure, compared on total cost with a simple non-AI baseline.

    Decision framework

    1. If a requirement has no number and no measurement point, then do not start building against it, because the team cannot tell whether it succeeded; revisit when the product owner can state what result would make them say no.
    2. If a constraint is marked fixed, then exclude options that break it before comparing anything else, because a better option that violates a contract is not an option; revisit when the owner of the constraint changes it in writing.
    3. If an owned capability could meet the requirement, then trial it first, because it is the cheapest to test and keeps data inside the boundary; revisit when the trial misses the bar on the evaluation set.
    4. If a decision is expensive to reverse or constrains later choices, then write an ADR before the build starts, because the reasons are easiest to recall now; revisit at the review trigger written in the record.
    5. If a design review ends without a recorded outcome, then treat the design as not approved, because unrecorded approvals are remembered differently by each attendee; revisit at the next scheduled review.
    6. If the risk of one wrong output is high and hard to detect, then add a human approval step and test it as a requirement, because tolerance is the owner's decision and a filter is not proof; revisit when evidence shows the error rate and impact are both lower than assumed.

    Comparison of the main options

    Option Strengths Weaknesses Choose when Typical failure
    Configure an owned capability Fastest to test; data stays put; no new vendor Capped by what the tool can do The requirement is narrow or the tool is close to it Quality ceiling discovered late
    Buy a product or managed service Faster than building; vendor shares maintenance Less control; vendor changes can break behaviour; data path to assess The need is common and not a differentiator A demo passes, your data fails
    Build on model and data components Full control of behaviour and data path Highest effort and maintenance; you own evaluation A differentiator, or a constraint no product meets Cost overrun from unplanned maintenance
    Hybrid (buy a base, build the edges) Fits unusual workflows without a full build Integration seams to maintain A product covers 80% and the rest is stable Seams become the fragile part
    Do nothing yet Zero cost; keeps options open The problem persists Requirements or evidence are missing Drift into an unreviewed pilot

    Failure scenarios to design for

    1. A requirement exists only in conversation. Behaviour: if a requirement is not in the written requirements sheet, it does not count as accepted for release; the design review checks the sheet, not memory.
    2. The evaluation set is too small to support the claim. Behaviour: the release report states the pass rate with its confidence interval, and a result whose interval straddles the bar is reported as "not demonstrated", not as a pass.
    3. The model or prompt changes after approval. Behaviour: any change to the model, prompt or retrieval re-runs the release set; a drop below the bar blocks promotion and reverts to the previous version.
    4. Constraints change mid-project (for example a data-residency rule). Behaviour: the owner raises it, the affected ADRs move to a review state, and a superseding ADR is drafted before the build continues.
    5. The review is skipped under deadline pressure. Behaviour: launch without a recorded review outcome is not permitted; a shorter review with the same questions is the minimum.
    6. The decision log goes stale. Behaviour: each ADR has an owner and a review trigger; a quarterly pass marks accepted records as still valid, deprecated or superseded.

    Worked example

    A support-summary feature has the illustrative requirements below (a different feature from the ADR example, so the numbers differ). Five calculations show how to turn requirements into numbers.

    1. Error budget. An availability objective of 99.5% over a 30-day window on 400,000 requests allows (1 − 0.995) × 400,000 = 0.005 × 400,000 = 2,000 failed requests in the window. The SRE book describes an error budget as a rate at which the SLOs can be missed, tracked on a daily or weekly basis. A "failure" here is a request that returns no valid summary within the latency limit.

    2. Latency budget. The requirement is p95 end-to-end of 6 s. Allocate it across the stages and keep slack.

    Figure 6. A latency budget on the request path

    sequenceDiagram accTitle: Latency budget on the request path accDescr: One request passes the gateway, retrieval, policy check, model call, output validation and rendering, with a time budget for each stage summing to 5.6 seconds inside a six-second target. If the model call exceeds its budget the orchestrator returns a fallback. participant CA as Client app participant GW as API gateway participant OR as Orchestrator participant RT as Retriever participant PE as Policy engine participant MG as Model gateway participant LP as LLM provider CA->>GW: Request (budget 0.2 s) GW->>OR: Authenticated call OR->>RT: Fetch ticket context (budget 0.8 s) RT-->>OR: Passages OR->>PE: Check data policy (budget 0.2 s) PE-->>OR: Allow OR->>MG: Generate summary MG->>LP: Model call (budget 3.8 s) alt Within budget LP-->>MG: Summary MG-->>OR: Summary OR->>OR: Validate output (budget 0.4 s) OR-->>CA: Summary, render (budget 0.2 s) else Provider too slow MG-->>OR: Timeout at 3.8 s OR-->>CA: Fallback message and retry option end Note over CA,LP: Stage budgets sum to 5.6 s, leaving 0.4 s of slack in the 6 s target.

    How to read this: each stage carries a time budget, and the slow-provider branch shows the behaviour agreed in advance, a fallback rather than a hang.

    The stage budgets are 0.2 + 0.8 + 0.2 + 3.8 + 0.4 + 0.2 = 5.6 s, which leaves 6.0 − 5.6 = 0.4 s of slack. Percentiles of separate stages do not add up exactly, so this is a planning budget. Measure the end-to-end percentile in a load test.

    3. Cost per request. A monthly budget of 6,000 currency units over 400,000 requests allows 6,000 / 400,000 = 0.015 per request. The token allowance follows from the price: allowed tokens per request = 0.015 / price per token. Get the price per token from the cost estimator for the model and date you use, and include retries and embedding calls in the count.

    4. Does a pass rate support a quality bar? With the normal-approximation interval, the 95% bounds of a pass rate are p ± 1.96 × √(p(1 − p) / n). Suppose 180 of 200 summaries pass. Then p = 0.90, the standard error is √(0.9 × 0.1 / 200) = √0.00045 = 0.0212, and 1.96 × 0.0212 = 0.0416. The interval is about 85.8% to 94.2%. A requirement of "at least 90%" is met by the point estimate, but the data cannot rule out a true rate near 86%. The lower bound is always below the observed rate, so to show a lower bound of at least 90% you need an observed rate above 90% and a sample large enough for the margin to fit under it; a bigger sample at exactly 90% only narrows the interval. This normal approximation is simple and is poorer near 0% and 100% or at small samples; use an exact or Wilson interval there.

    5. Zero failures is not zero risk. Suppose none of 80 adversarial cases produced a leak. If the true leak rate were p, the chance of seeing zero in 80 independent cases is (1 − p)^80. Setting that equal to 0.05 gives p = 1 − 0.05^(1/80) = 0.0368. So zero hits in 80 cases is consistent, at 95% confidence, with a true rate up to about 3.7%. That is why a risk requirement needs both a test set big enough for its tolerance and controls that do not depend on the test passing.

    Assumptions: 400,000 requests per month, a 30-day window, a 6,000 currency-unit budget, 200 and 80 as example sample sizes, all stage times and the 99.5% objective chosen for illustration, independent cases, and a 95% confidence level with z = 1.96.

    Requirements as an executable acceptance check

    Requirements that live in a document drift. Put the thresholds in code that runs against the evaluation results, so a change that breaks one fails the build. The sketch below checks quality (with the lower bound from the worked example), p95 latency (nearest-rank) and mean cost against the thresholds. It needs only the standard library.

    import math
    
    REQ = {"quality_lower_bound": 0.85, "latency_p95_s": 5.0, "cost_mean": 0.20}
    
    def percentile(values, q):
        ordered = sorted(values)
        return ordered[math.ceil(q * len(ordered)) - 1]  # nearest rank
    
    def lower_bound(passes, n, z=1.96):
        p = passes / n
        return p - z * math.sqrt(p * (1 - p) / n)
    
    def check(results):
        """results: list of dicts with ok (bool), latency_s (float), cost (float)."""
        n = len(results)
        got = {
            "quality_lower_bound": lower_bound(sum(r["ok"] for r in results), n),
            "latency_p95_s": percentile([r["latency_s"] for r in results], 0.95),
            "cost_mean": sum(r["cost"] for r in results) / n,
        }
        got["pass"] = (got["quality_lower_bound"] >= REQ["quality_lower_bound"]
                       and got["latency_p95_s"] <= REQ["latency_p95_s"]
                       and got["cost_mean"] <= REQ["cost_mean"])
        return got

    With 400 results where 353 pass, latencies evenly spaced from 1.0 to 4.9 s and a cost of 0.12 each, check reports a lower bound of about 0.851, a p95 of 4.7 s and a pass. At 352 passes the lower bound falls to about 0.848 and the check fails: the point estimate (88%) looks fine and the requirement still is not demonstrated, which is the behaviour you want a gate to have. Wire the function into CI so a prompt or model change cannot merge without the numbers.

    Common mistakes

    • Writing requirements as adjectives. "Fast", "accurate" and "safe" cannot fail a test. Replace each with an indicator, a threshold and a measurement point.
    • Setting the target from the prototype's result. The SRE book warns against picking a target based on current performance. The target comes from the user's need; the prototype tells you how far away you are.
    • Treating "buy" as the end of design work. A product still needs requirements, an evaluation on your data, a data-flow review and an exit plan.
    • Editing an old ADR instead of superseding it. The edit erases why the earlier choice was reasonable, which is the information the next team needs.
    • Using the design review as a demo. A demo shows the happy path. A review checks the failure paths, the evidence and the rollback.
    • Hiding preferences as constraints. "We cannot use that vendor" needs a named owner and a reason, or it is a preference and should be weighed as one.

    Try it

    Time: 20 to 40 minutes. Pick one AI feature you work on or have been asked to scope (or use "a chatbot that answers HR policy questions" if you have none).

    1. Write one requirement for each of the five kinds (quality bar, latency, cost, risk, data sensitivity) in testable form: a threshold, a measurement point and a check.
    2. List three constraints and mark each fixed or negotiable, with the owner.
    3. Sketch the build, buy and configure options in one table row each, naming one simple non-AI option.
    4. Write a one-page ADR for the choice you would make, using the five sections, with a status and a review trigger.
    5. Draft five questions you would ask in a review of your own design.

    Done when each requirement names a number and a place where it is measured, the ADR states its status and a review trigger, and a colleague who was not involved can say what result would make you reverse the decision.

    Key takeaways

    • A requirement is useful only if a test can fail it: state the indicator, the threshold, the window and where it is measured.
    • Use the SLI and SLO vocabulary from the SRE book for latency and cost, and extend it to quality with a rubric and a fixed evaluation set.
    • Risk is probability combined with consequence, and the tolerance is an owner's documented decision, not something the model or the framework supplies.
    • Separate constraints from preferences, mark which are fixed, and name who can change them.
    • Evaluate configure, then buy, then build, on the same evaluation set and over a three-year cost.
    • Write an ADR for decisions that are costly to reverse; supersede rather than edit; set a review trigger.
    • A design review is complete only when it records one of three outcomes with owners and dates.

    Self-check

    1. Why is "p95 latency under 4 seconds" an incomplete requirement on its own?

    It does not say where the clock starts and stops or under what conditions it holds. The SRE book says SLOs should specify how they are measured and the conditions under which they are valid. Measured at the browser it includes the network and rendering; at the gateway it does not, and the input size or load level also changes the result.

    2. A model scores 180 of 200 on the evaluation set and the requirement is "at least 90%". Is it demonstrated?

    Not conclusively. The point estimate is exactly 90%, but the 95% interval is about 85.8% to 94.2%, so the true rate could be below the bar. Report it as not demonstrated. A larger sample alone will not fix it at exactly 90%, so improve the system until the observed rate is high enough for the lower bound to clear the bar.

    3. What is the difference between a requirement and a constraint, and why track them separately?

    A requirement states what the system must achieve; a constraint limits how you may achieve it, usually because of something outside the design such as a contract, platform or budget. They behave differently in decisions: fixed constraints remove options before any comparison, while requirements are used to score the options that remain.

    4. When should you write a new ADR rather than edit an existing one?

    When the context has changed enough that the decision would change, for example a requirement is tightened or a provider changes terms. Nygard's post says to keep the old record and mark it superseded, because it is still relevant to know that it was the decision, even though it no longer is.

    5. A design review ends with "looks good, let's proceed". What is missing?

    A recorded outcome. A review should end as approved, approved with conditions (each with an owner and a date) or not approved (with the missing evidence listed), and the ADR status should change accordingly. Unrecorded approvals are remembered differently by each attendee.

    Further reading

    Last verified: 2026-10-21

    Next

    Continue to page 3: Diagramming AI systems, which teaches how to draw the context, component and runtime views that a design review needs.

    Enroll to keep reading

    Lesson 2 of 13 · AI Architect: From AI Engineer to Expert

    How AI architects write testable requirements, weigh build vs buy vs configure, record choices in decision records and run design reviews that end in decisions.

    In the rest of this lesson

    • Case files
    • Decision framework
    • Comparison of the main options
    • Failure scenarios to design for
    • Worked example
    • Requirements as an executable acceptance check

    Enrolling is free. It unlocks every lesson in AI Architect: From AI Engineer to Expert, tracks your progress across devices and keeps your quiz scores. The newsletter is optional.

    Ask about this article

    Get answers grounded in this post. AI-generated — based on this article, and may be imperfect.

    Scaled AI Weekly

    Enjoyed this? Get more like it every Monday.

    Real architecture decisions, LLMOps patterns that survive production, and engineering leadership advice — from 12+ years of building at enterprise scale. Free. No spam. Unsubscribe anytime.

    Get new articles by email

    Free. We email a confirmation link first, and you can unsubscribe from any email.

    Join engineers building production AI systems

    Comments